Posts Tagged ‘footbridge’
River Running
Winter has loosed its grip. When we walked the perimeter yesterday morning while the temperature was below freezing, there was little evidence of a meltdown unleashing the spring runoff. By mid-afternoon, the drainage ditches were alive with running water.
The air temperature probably hit 50°F for a bit, resulting in water flowing as if there was an actual river along our southern property border, not just a swale that sits dry most of the time.
The bridge I built along the back pasture fence line was doing its job to perfection as the flow of water across our land poured beneath it into the main ditch just beyond.
If I didn’t know better, I’d be looking to see if I could spot any brook trout flitting around in the current.
From the looks of the extended forecast, we should have a nicely controlled meltdown in the days ahead, with overnight temperatures slowing the thaw for a few hours and daytime warmth climbing well into fast-melting territory.
Manure droppings in the paddock are no longer able to hide beneath snow cover. I’m actually looking forward to getting the place cleaned up again to our usual high standards. The only complication with that plan is that I don’t have a lot of open composting space to dump the couple of wheelbarrows-full it will require. The winters-worth of accumulation doesn’t break down so we’ve already got quite a few stacks that will need to be tended once they thaw. I need to stir the piles up and reshape them to get the composting action heating up so they will break down and shrink enough to begin merging piles together.
The fertilizer factory will be back in full swing before the trees leaf out.
Walking around with no coat on yesterday had me wondering if now would be a good time to take the plow blade off the Grizzly ATV. I don’t like to tempt fate. My mind quickly flashes memories of our first spring here when it snowed 18″ in the first few days of May.
A lot could happen weather-wise in the next month or so. I know from experience not to put away shovels just because the winter snow has all melted away. The plow isn’t hurting anything right where it is for now.
In the meantime, the new road bike I bought over the winter is about to get multiple outings to test how well we get along with each other.
When rivers start flowing through the snow, my bicycling season is nigh.
.
.
Wet Now
Over three inches in about 24 hours has definitely done the trick. It’s not dry out there at all anymore. As Cyndie put it, “There are rivers running everywhere that rivers can run on our land.”
The footbridge is doing its job nicely. The river runs under it.
Cyndie’s perennial garden, down slope of the neighboring farm field, has a river running through it.
We have grown accustomed to this routine, so it causes less anxiety than it used to. This amount of rain is pretty reasonable, actually, compared to some of the deluges we have previously faced.
The trees, shrubs, and grasses have in a matter of two days become the dominating color of the landscape and it is all about being green.
For the next day or two, green and very wet.
.
.
Bridge Built
It hasn’t started raining today yet, but precipitation is on the way. Knowing that, yesterday I made it a priority to finish the bridge I started a week ago. I wanted to get it done while the weather was nice. I’ll let the pictures tell most of the story:
Once the frame was complete, I used the cut pieces (previously employed as shims to level joists during assembly) for reducing friction when I single-handedly dragged the base across the gorge. It was heavy!
For now, there will be a step up onto the deck, but at some point in the near future, I plan to dig down so the ends will be at ground level so the lawn tractor can roll smoothly up and over.
I wonder how heavy it is now.
If we get too much water flowing, the whole thing will get pushed out of position. However, if that happens, we will have other flood-related problems to deal with that will make the shifted bridge a minor concern.
I’m going to bank on the likelihood that’s not gonna happen.
.
.
Working Alone
My high hope of building a footbridge in a single weekend fell victim to my need to accomplish all the tasks without a helper and also my being the sole entertainer for Delilah’s high-energy needs.
Add in the less-than-ideal windy and cold spring weather, plus the limitations of the batteries for my cordless circular saw, and my inability to finish by the end of the day yesterday was not all that surprising.
I resorted to two different solutions for supporting the long boards that I cut. That treated lumber is really heavy compared to the remnants of the old cedar deck boards I’m using for bracing.
.
.
.
.
.
.
.
The pallets had a tendency to collapse, so I switched up to plan B on the second day: old moldy hay bales. That provided welcome consistency.
Because the bridge will end up being very heavy, I decided to build the frame right next to the washout I’m covering and then drag it into position.
.
.
.
.
.
.
.
I was able to haul the boards down by the fence and begin to screw some of the cross-supports into position but quit when the time had passed for Delilah’s dinner. I’ll leave the finishing until next weekend.
Trying to screw the pieces together square and true proved challenging on the uneven ground. I want to give that the time and attention necessary to get everything precisely the way I want it. Then I plan to move it into position before screwing down the floorboards.
I’m not sure I’d be able to lift it if I waited until it was completely built. I mean, not without someone with a strong back to help me.
.
.