Concept Proved
I did a test length of backfilling the sharp drop from the driveway’s gravel shoulder to the grass to soften the slope. We plan to toss some grass seed on that and call it finished.
.
.
.
.
.
.
.
I think it is a reasonable improvement. Before we can actually achieve this level of finish, there remains a lot of distance of asphalt edge that is still exposed. I knocked off another 25 yards by myself yesterday. A little progress is better than no progress at all. I’m looking forward to Cyndie’s return tomorrow so we can double-team the job, which effectively doubles the distance we can complete in a day.
Actually, we have made enough progress toward getting the gravel pulled up over all the edges that seeing the shrinking distance that remains is starting to serve as “a carrot” enticing us to keep after it to get ‘er done.
I keep picturing the challenge I will have, come winter when I need to navigate the slopes of those edges to plow snow beyond the width of the pavement. The less steep we can make that slope, the better it will be for me for clearing snow.
Unfortunately, what I envision is that the blade will likely tear up much of the grass we might be able to get growing on those slopes by winter. It will give me extra incentive to be careful about keeping the blade up a few inches on the sides. I can hope that we get some good hard freezes before the first plowable amount of snow falls. That makes all the difference. If the ground isn’t frozen by the time I need to plow the driveway, it’s always a messy exercise.
I wonder if we will get much snow this winter. We didn’t buy the heated driveway option to melt snow off the pavement.
.
.
Leave a Reply