Posts Tagged ‘DIY project’
More Prep
I suffered a rough night’s sleep, ruminating about the difficulties we experienced in getting stones to remain attached to the wall with the miracle substance, “StickyStone.” Cyndie and I decided to add a step to our preparation, hoping to finish the project with a higher rate of success by the end of the day yesterday.
I found some moderately rough sandpaper that we used to flatten high points on the underside of the manufactured stones.
On Wednesday, several of the stones would teeter a little after we pressed them into place and I expect that directly worked against a secure bond between the two surfaces. The rough, uneven texture on the back is probably a plus when using masonry mud on a scratch coat to get things to hold firm. We had chosen a method that allowed me to avoid slapping mud around due to my lack of know-how. (Regardless of how many instructional YouTube videos might exist.)
That last added step of preparation seemed to do the trick. Initially, I expected to have more than enough adhesive, but after making so many second and third attempts on Wednesday, the dwindling supply, identifiable by the ever-shortening rod of the plunger in the gun, had me wishing I’d bought a second tube.
I pushed my luck and doled out the adhesive in increasingly smaller doses as we worked our way around the last corner. We finished with almost nothing left in the tube.
For a before and after comparison, this is what one corner looked like before the log home builders trimmed off the bottom portions that were rotting:
They cut them pretty high and framed up the exposed area with treated lumber. By yesterday afternoon, this shows the change:
I will not attempt to remedy the heaving pavers on the ground that have become more problematic every year. We talked to a professional landscaper yesterday who stopped by for a consultation on dealing with the many interrelated issues contributing to the problems.
It leaves me wanting to go home and deal with problems more within my reach, like trying to knock down lush green grass that gets almost too tall for my mower in just a few days after a previous cut.
The added preparation step for mowing the ridiculously tall grass involves a first pass with the string trimmer in the areas of most difficulty. Somehow, that needs to be achieved without too much delay in getting back to mow areas that haven’t gotten out of control yet.
We definitely need the added hours of daylight we’ve been gaining as the planet hurtles toward the summer solstice next month. It’s getting hard for me to remember those wonderful days of winter when so little demand on my time and attention was a dominating theme.
Ah, those were the days.
.
.
Rock Fitting
On the way to the lake yesterday, we dropped Asher off for his in-residence training and he accepted the unfamiliar surroundings without complaint.
Asher is barely visible in the far pen beyond the front area occupied by a dog he didn’t yet know. He passed by this front dog with a brief check, and receiving no response, he decided to ignore it and move on to sniffing every surface in his pen.
We felt it was a great start. Satisfied Asher was in good hands, we hopped in our car and drove the rest of the way to the lake without him.
While we are up here, we are planning to add a finishing touch to the old cabin where the log guys cut off the bottom of rotting logs in March. Having a large stash of faux rocks at home, we brought some up for the job.
These rocks had spent some time as markers in our labyrinth and as a result, developed a layer of dirt that needed to be removed.
That’s fine. We had some time to spare.
After cleaning them up and spreading the rocks out so we could see them, we tried mocking up the layouts for each space.
It seemed like a good plan to me. We felt encouraged by the process and figured the hard work was all behind us. The next phase involved a new adhesive from Techniseal called Stickystone. It is a fast-setting vertical hardscape adhesive.
Unfortunately, it didn’t go as well as my test case back at home. A few rocks had fallen off the foundation of the house in Beldenville so I tested the Stickystone to reattach them and it worked with ease.
For some reason that I haven’t figured out, getting the adhesive to hold the rocks in place up here is only successful about half the time. After completing two of the five surfaces, we were using up the limited supply of adhesive too fast and my patience was dwindling.
We had spent so much time cleaning and prepping that the mounting and remounting had pushed us past the dinner hour. We were tired and hungry and I was very frustrated. Our remedy was a trip to Coop’s Pizza for dinner.
If it’s not too rainy this morning, we’ll try hanging more rocks until the adhesive runs out. I will be looking to focus on the outlook that partial progress is better than no progress at all.
Come to think of it, that’s also one way we will be considering Asher’s training while he is away.
.
.
Nests Removed
After a long delay in my attention to the project of mounting our surveillance camera, I dug back into it yesterday. That digging uncovered the presence of six old hornet nests and one large bird’s nest, none of which I realized existed under the shop entrance roof.
One of the primary things slowing me down in committing to this installation has been the issue of how I would get power to the camera. I decided to pull down the light fixture to gain access to the AC wiring. Deep inside the cover of that light fixture was where one of those wasp nests I didn’t know about was hidden.
I’m happy to be dealing with these nests in the winter when no wasps are present.
Some shopping for supplies will need to happen so I can add an outdoor outlet to the circuit of the light fixture. I will take this opportunity to also add a switch for that outdoor light fixture up over the door to the shop. For the longest time, I couldn’t figure out why that light never came on. Then I discovered it was directly wired to a circuit breaker that was in the “off” position. There was no switch. Oops.
As I was putting the ladder away after returning from feeding the horses, I noticed the ice mound under the eave in front of the garage was soft enough that I could break it up and finally remove it. One thing led to another and I decided to also shovel the soft snow from the giant mound that remained on the pavement. It would be good to open up that space for plowing the new snow predicted to fall in the next few days.
Shoveling that enormous pile of snow proved to be a bigger task than I should have tried to muscle my way through. I felt a pang in my ribs as I tossed one too many heavy shovel-full and that put an end to moving any more snow. I’m hoping that by stopping right away, the damage will be mild and not infringe on my ability to shovel when this next storm hits.
Today might end up being a day of more desk work than physical activity. It’s not like I needed an excuse to work on our tax returns or anything.
.
.
Added Steps
This morning’s frost was cold enough to create a cover of ice over the horse’s waterer, affirming our suspicion the automatic heaters are no longer up to the task they performed so well in the early years. We have hopes of remedying that before the daytime temperatures no longer climb above freezing this fall.
There was enough frost on the grass this morning that I “skated” along after we popped out of the woods on our way to feed the horses.
At first, we worried that Mix might be suffering some medical issue because her behavior of pawing the ground, snorting, rising up, chasing after others, and kicking seemed to indicate she was in pain. When she settled down enough for feed pans to be served, calm chewing replaced the wild behavior.
I suggested to Cyndie that Mix might have just been trying to rev up her engine in response to the cold morning. While they were all eating, the sun cleared the horizon and instantly began to warm surfaces. The horses all stand sideways to the warming beam, soaking it up as they gobble up their feed.
My projects yesterday included the addition of steps on a path from the driveway that had gotten even steeper than it already was before the resurfacing increased the height of the pavement. Over the last week, we’ve collected a spare wood beam and some rocks for the task.
There weren’t a lot of fill options handy so I attempted to sculpt something minimal and then scrounged the surrounding area for shovel-able dirt.
What I found was so fine it couldn’t be called sand. It was more like dust. On the edge of the woods, a tree had tipped years ago and this was the “soil” around the root bundle that looked solid enough until I dug into it with a shovel.
After that proved marginal for my purposes, I gave up on finding something close and headed down to the small paddock where I needed to re-dig a drainage channel that hoof traffic had obliterated over time. That was a long way to push a heavy wheelbarrow so I chose to finish with a lighter (and closer) load of composted manure.
I’ve got two rocks yet to place but the new steps leading past Cyndie’s strawberry patch have met with her approval thus far. We’ve walked that slope for years without steps so having just a few added breaks to the slant seems like a significant improvement.
We’ll have to see what a few freeze/thaw cycles, some heavy rain, and just passing time will do to the stability of the improvised effort.
I hope it holds because we are both pleased with the rustic look that my crude attempt has produced.
.
.
Almost Done
We got close to finishing the woodshed project before calling it a day yesterday afternoon. All that remains is installing shingles on the roof. I plan to do that when we return next weekend.
Cyndie was an essential contributor to the progress achieved. We verbally sparred over the math to figure spacing as I wrestled with factoring in the number of spaces is one more than the number of boards.
She kept solving math calculations in her head before I could enter the numbers into the calculator on my phone. At one point, as I was cutting a spacer block to a dimension I calculated, she texted me the same spacer dimension she figured out while taking Delilah for a walk.
.
.
.
.
.
.
.
With tools put away, I was able to grab the remains of the previous unprotected stack of firewood and move it into the new shed.
I look forward to seeing it filled with a couple of years worth of split firewood. We’ll need the first batch soon as cooling weather is about to bring on the days when comforting fires in the fireplace become de rigueur.
.
.
Mostly Level
It is soaking wet this morning but the rain held off long enough yesterday to allow about a half-day’s worth of effort on my assembly project.
.
.
.
.
.
.
.
I continue to be challenged with thinking I have one portion positioned correctly while neglecting to notice an opposite corner was torqued at an angle at the time. I needed to add a one-inch shim to compensate for one such mistake but ultimately achieved near-perfection on getting the base established.
The best part of working on things up here is the ability to dive into the lake just steps away to cool off after a sweaty effort. We had a nice swim and quick sandwich on the deck before the rain dampened things.
Next up is constructing the roof. I’m unsure what portion I will assemble on the ground before lifting it into place. With luck, I will figure that out before it becomes too heavy for Cyndie and me to lift over our heads and screw into place.
.
.
Position Precision
Perfection is my nemesis and often complicates attempts to make quick progress on starting a project. Soon after I first started thinking about improving the way firewood is stored up at the lake, I was in a quandary about making the first cut of lumber to enact my plan. Obviously, I got past that.
Now I’ve got all the pieces staged and it’s time to start assembly. With four blocks for footings, I just need to set them in position. Simple as that.
I wish.
Is it square? Square to what? Level is easy, referencing a floating bubble, but square is a bit more difficult to ascertain. I start to doubt my visual perception after placing a board against what I thought was an acceptably positioned block to then find it is far out of line with my ultimate intention.
Getting the first block established finally provided a reference I could work from to place the other three. I am choosing to leave the ground sloped and support the right side of the shed on posts, but the exact mechanism is yet to be defined. I changed my mind twice already and the second time was after I thought I had the blocks in place.
I need to reposition them one more time.
When I get the two blocks on the right side ultimately located and leveled, construction should be able to commence at a reasonable pace, with just one hitch. It occurred to me this morning that I neglected to bring up any spare lumber.
While unsuccessfully trying to avoid waking my brain up too early this morning, I conjured up an improvement on the technique I had in mind to support the right side on posts. All I need is another plank or two of treated lumber and I’m set. D’oh!
I will use one of the cut pieces intended for the floor and bring up a replacement board for that one next weekend when we come up for Labor Day.
Before I get to any of that, I need to perfectly position those two blocks on the right end of the frame.
Here’s hoping I will allow myself to settle for good enough.
.
.


























