Posts Tagged ‘demolition’
Emphatic Change
I don’t know if you will be able to tell the difference, but I am not writing from home this morning. Cyndie and I are in a completely different location on a lake in northern Wisconsin near a town with a Coop’s Pizza restaurant that serves one of our favorite crust/sauce/cheese combinations.
Okay, we are up at the lake place again. That shouldn’t be a surprise. I just felt a little mystery would be more interesting than the same old, same old this time around.
One thing is very different up here this visit, though, but it is not mysterious at all. The lodge has been reduced to a tiny shell of its old self.
We watched the beginning of the demolition as we left for home two weeks ago. I’m told they are waiting on some permits before new construction gets underway to replace the portion that was torn down. One of the first challenges will be leveling the floor of the remaining historic portion, aligning it with the fixed position of the fireplace and chimney.
There is a wild dynamic at play, as the massive change of the shared space vanishes so dramatically, yet it doesn’t feel like that big of a deal at this point. I believe this community of six families has grown accustomed to this kind of change over the years and understands how it will ultimately lead to positive outcomes in the long run.
I have a sense that the significance of these changes would have bothered me more when I was younger than I am experiencing today. Maybe not, though. I received an early lesson in this kind of change when the farmland where I lived as a kid was sold for development, stripped of its trees, and hills leveled so it could become an industrial park.
At this point in my life, I’m finding it surprisingly easier to accept “progress” that seems inevitable.
Change is always happening. Sometimes, just a little more emphatically than others.
.
.
Detail Oriented
Someone made a reference to me being anal in some of the things I do, in this case, related to my methods tending to the horses’ emptied grain feed bags. I’m not going to argue with that assessment, though I might use other words to describe my proclivity for order. I can come across as rather particular about how I want things to look around here. Maybe even fussy. Meticulous. Discriminating. Fastidious?
I can be detail-oriented. The height of the unmowed grass when we arrived at our driveway was rather shocking. That was a detail that was hard to miss. A less astute person might not pay attention to the grass growing in the seam of the concrete apron of the shop garage.
Was I being anal when I got on my knees and plucked all of those out before setting off on the riding mower? At least it looks like someone actually lives here again.
The grass blades were ten inches tall in some places along the driveway where I started cutting as soon as we got home yesterday. I needed to let go of my usual fussiness about achieving a clean-looking cut and settle for a version I’ll call: at-least-it’s-been-cut.
The mower balked a little at the complications of such long grass, but I think it still did an impressive job for an electric. The exit chute plugged once, and one of the blade motors overheated a couple of times. I needed to use the higher blade speed setting, which drains the batteries faster than normal, so I didn’t get as far as I wanted before quitting for the day.
There was a thunderstorm last night, so I don’t know if the grass will be dry enough to start mowing right away this morning. If it’s not, there is plenty of trimming to be done with the string trimmer and the hedge trimmer that I don’t mind doing when it’s wet.
I’ll be playing catch-up for a few days before starting over without pause to get a more reasonable, cleaner second cut before it has a chance to grow much.
The freshly cut hay field looks great, but that makes the tall grass left along the fence lines stand out that much more as needing to be addressed. Beyond that, the work of cutting up the giant oak limb remains as a large burden on the to-do list.
Lazy days on the lake are definitely over. For a couple of weeks, anyway. We plan to head up again for a 4-day weekend in the middle of the month. Then, again, the week after that, so don’t feel sorry for me in the least.
I look forward to seeing what the remains of the lodge destruction will look like upon our return. I like paying attention to the details of the work they are doing.
Before we left yesterday morning, we stopped down to watch the start of the serious demolition getting underway.
Might be time for an update to the song I wrote about Wildwood.
The old lodge don’t look the way it used to look…
.
.
Era Ending
Around 59 years ago, a group purchased an old fishing lodge and cabins on a lake in northern Wisconsin to create a vacation spot for their young families. They formed an association known as the Wildwood Lodge Club. There have probably been as many changes occurring in the association as have occurred with the growing families with each passing year.
Not only have member families dropped out and new families have been welcomed in, but individual lives have passed throughout the many years. Many times, tough decisions have been considered, and today we are seeing the most recent changes get underway.
In the late 70s, early 80s, the association divided lots, so instead of all families sharing cabins on a rotating basis, each family would own a specific plot. The association continued to hold the lodge and tennis court plots until the last couple of years. Now, families on the lots adjacent to those significant amenities have purchased them.
Yesterday, demolition began on the least precious portions of the historic old lodge.
Small trees were cleared away to make room for the teardown of the back portion of the lodge. We set out chairs so Cyndie’s mom could watch some of the work as it happened.
The structure was rotting to the point that it didn’t make sense to attempt repairs. The family that took possession of the lodge lot will build a new structure that will offer opportunities for a variety of future uses.
Windows and paneling were removed and saved for reuse in the new construction after the shell of the building is razed.
It definitely feels like the end of an era, but it isn’t really that final. It’s just another step in the 59 years of steps that have happened. They have moved cabins before, and even moved the main private roadway that runs to the end of our peninsula.
In the early 80s, I wrote a song about the changes that happened when families started building their own new “cabins” in place of the original vertical log shacks from the time it was a fishing resort.
It seems just like a week or two
And Fourth of July has come and gone
And I was up at my favorite place
Folks were there to have a good time
Work got done, and we had a good time
Cabins have moved, and new ones are growin’
A place to sleep’s not as easily found
I sit on the porch of what was cabin three
Almost see the beach you never used to see
Tommy and Jane, and Justin, it’s true
Are heard laughin’ and singin’ and workin’ too
It’s Wildwood, Wildwood
It’s been so long, but the change is good
Wildwoo-oo-oo-ooood
The old road don’t go the way it used to go
Nor some people’s car, the way the new one goes
But we all got together and pushed it out
Who says there weren’t games this holiday
When evening came, we gathered ‘round
for the kind of picnic you’re supposed to have
And though people not present were sadly missed
There were fireworks displayed to rival all time
Wildwood, Wildwood
It’s been so long, but the change is good
Wildwoo-oo-oo-ooood
As much as it seems as though it’s really changed
And mud has replaced the sprouts of poison ivy
The swing still swings between two big trees
From which you can still hear the Friswold’s up at cabin three
Hayward’s still a few minutes away
Round Lake’s just as clear as any day
And all the people who have made it what it really is
Are all the people who will make it what it really is
It’s Wildwood, Wildwood
It’s been so long, but the change is good
Wildwoo-oo-oo-ooood
.
.
Crown Replacement
The latest, and hopefully last, home improvement project of the fall is a replacement of the concrete crown on our chimney. The structure is 34 years old and was cracking and headed for increasingly problematic water penetration. On Friday, work began in earnest, beginning with the demolition of the old crown.
Just because it was starting to crack in places didn’t mean it was going to simply fall apart in Jason, the contractor’s hands, after a few blows from his heavy-duty hammer. The old masonry put up a fight that forced him to spend twice the time he expected the demo to take.
Watching his partner, Charlie, muscle the massive chunks down three ladders over and over again made my muscles ache in sympathy. Especially knowing he is going to need to muscle buckets of new cement up three ladders over and over again when they pour the new crown.
Luckily, he gets the weekend between each phase.
From a safe vantage point on the ground, I watched them work up there and several times felt my nerves wobble as they moved around in awkward positions with awkward loads or wielding power tools with dangly power cords.
As they cut into the point where stones end, and concrete began, the dust blew into the air, looking like smoke coming out the top.
When Jason finally arrived last Wednesday, several weeks after it was hinted they could fit us into the schedule, he was alone and warned he would probably only be able to complete initial preparations. His partner was out unexpectedly that day due to a death in the family.
The next day, Thursday, would be unavailable because of doctor appointments. I had told the company that Wednesday was a good start because we had company coming over the weekend, hoping they would be done by then.
What can ya do? On Friday morning, Jason checked one last time before showing up to ask whether I wanted them to wait until Monday to start making a mess of things since we had people coming for a visit.
“No!”
I didn’t want any more delays, and the weather was supposed to be perfect, and it was just Cyndie’s brother bringing his new “friend” and her kids to see the place for the first time, and it would be no big deal if the place looked under construction. Get ‘er done.
The original plan was to break up the old crown in the morning and pour the new crown in the afternoon, but that isn’t the way things worked out. After they got the old crown removed, they needed to do some additional grinding of the stones around the top to create a flat surface to secure the framing for the new pour.
It’s very satisfying to see that every aspect of this project is beyond my DIY capabilities. It makes the not-insignificant expense easier to accept.
In the end, it will probably be similar to the cost of a new crown from a dentist, which is a steal because these guys are installing a crown in the equivalent environs of a circus high-wire act.
.
.












