Relative Something

*this* John W. Hays' take on things and experiences

Rock Fitting

leave a comment »

On the way to the lake yesterday, we dropped Asher off for his in-residence training and he accepted the unfamiliar surroundings without complaint.

Asher is barely visible in the far pen beyond the front area occupied by a dog he didn’t yet know. He passed by this front dog with a brief check, and receiving no response, he decided to ignore it and move on to sniffing every surface in his pen.

We felt it was a  great start. Satisfied Asher was in good hands, we hopped in our car and drove the rest of the way to the lake without him.

While we are up here, we are planning to add a finishing touch to the old cabin where the log guys cut off the bottom of rotting logs in March. Having a large stash of faux rocks at home, we brought some up for the job.

These rocks had spent some time as markers in our labyrinth and as a result, developed a layer of dirt that needed to be removed.

That’s fine. We had some time to spare.

After cleaning them up and spreading the rocks out so we could see them, we tried mocking up the layouts for each space.

It seemed like a good plan to me. We felt encouraged by the process and figured the hard work was all behind us. The next phase involved a new adhesive from Techniseal called Stickystone. It is a fast-setting vertical hardscape adhesive.

Unfortunately, it didn’t go as well as my test case back at home. A few rocks had fallen off the foundation of the house in Beldenville so I tested the Stickystone to reattach them and it worked with ease.

For some reason that I haven’t figured out, getting the adhesive to hold the rocks in place up here is only successful about half the time. After completing two of the five surfaces, we were using up the limited supply of adhesive too fast and my patience was dwindling.

We had spent so much time cleaning and prepping that the mounting and remounting had pushed us past the dinner hour. We were tired and hungry and I was very frustrated. Our remedy was a trip to Coop’s Pizza for dinner.

If it’s not too rainy this morning, we’ll try hanging more rocks until the adhesive runs out. I will be looking to focus on the outlook that partial progress is better than no progress at all.

Come to think of it, that’s also one way we will be considering Asher’s training while he is away.

.

.

Leave a comment

This site uses Akismet to reduce spam. Learn how your comment data is processed.